The track rat has not been to an NSXPO since California, so I thought it was high time to get her back on her feet again with some nice go fast goodies. Engine, aero and suspension work by Rob Morrison. Cage and further improvements by SpeedWerks in Thomasville, NC. Enjoy the pictures. She is not finished yet but they say she will be drivable by next Wednesday.
Cage construction starts. Thanks to Rob Morrison for the weld to plates.
Cage construction starts. Thanks to Rob Morrison for the weld to plates.
Attachments
-
original engine bay1.jpg69 KB · Views: 233
-
Original front bay2.jpg52.9 KB · Views: 217
-
MSD3.jpg81.6 KB · Views: 205
-
more wires4.jpg61.4 KB · Views: 193
-
Bolt in plate formed to fit body5.jpg55.7 KB · Views: 164
-
front shock bolt on plate6.jpg51 KB · Views: 150
-
rear shock bolt on plate7.jpg55.8 KB · Views: 164
-
Left rear shock attachment8.jpg87.4 KB · Views: 269
-
Right rear shock attachment9.jpg85.8 KB · Views: 209
-
Right front shock attachment10.jpg53.3 KB · Views: 155
-
Left front shock attachment11.jpg59.7 KB · Views: 140
-
Nascar door bars drivers side12.jpg73.2 KB · Views: 214
-
X brace passenger side13.jpg64.7 KB · Views: 157
-
dash bar with front shock bar through firewall11.jpg68.1 KB · Views: 156
-
test fitting the seat14.jpg78.6 KB · Views: 224
-
Nearly finished15.jpg77.3 KB · Views: 166
-
Extra long studs with open nuts.jpg57.3 KB · Views: 144
-
door reattached16.jpg71.7 KB · Views: 265
-
The yellow dog17.jpg56.3 KB · Views: 265