Changed out the clutch slave and master today with a total flush of the system fluid. Shifts perfect & No leaks :smile:
Time it took: 4 hours.
Put the Dali 1" hollow front & rear sway bars on. (Fronts a real bitch to get in position)
Time it took: 2 hours, 30 minutes rear, 1-1/2 hours front :frown:
Put the front non compliance clamps on today.
Time it took: 30 minutes
Put the front end lower support beam on today. The upper one can wait until I get my new racing radiator with oil cooler later this month.
Time it took: 15 minutes.
All and all, maybe 7 hours to get all this done and save myself probably $600.00 in labor charges, if not more. Great day !:biggrin:
Best of all, I know it's all been done right....
Thanks Guys and Prime, got most of the information I needed to complete these jobs right here !
Time it took: 4 hours.
Put the Dali 1" hollow front & rear sway bars on. (Fronts a real bitch to get in position)
Time it took: 2 hours, 30 minutes rear, 1-1/2 hours front :frown:
Put the front non compliance clamps on today.
Time it took: 30 minutes
Put the front end lower support beam on today. The upper one can wait until I get my new racing radiator with oil cooler later this month.
Time it took: 15 minutes.
All and all, maybe 7 hours to get all this done and save myself probably $600.00 in labor charges, if not more. Great day !:biggrin:
Best of all, I know it's all been done right....
Thanks Guys and Prime, got most of the information I needed to complete these jobs right here !
Last edited: