This is how the headlights came out, they're still waiting on the bixenon retrofit, so perhaps 2 more weeks before they can be installed. The car is scheduled to be repainted on the 30th of this month, with pickup on December 1st.
Headlight housings:
Some other parts have arrived in the meantime, here are some pics...
New Sparco Extreme steering wheel:
Stack ST8130 cluster with SARD nsx adapter panel:
And today I installed the new Boss Short Hub, and mounted the sequential shift light in between the paddles of the quick release; the shift light is wired through the cable reel, and turns with the steering wheel:
Next week the Stack cluster will be installed, and the car will go in for paint at the end of the month. Next month the headlights will go in, and the Mugen harness bar, Sabelt harnesses, and Project Mu SCR-Pro rotors will be installed.
Also, I have a new design for the exhaust system that should result in a slight power gain, I intend to proceed with having this fabricated next month after these other projects are done, then I will have the car retuned.